幸运彩app

Position : Home > 幸运彩app下载官网 > Experimental electric furnace and baking equipment > GSX series of high-efficiency energy-saving high-temperature sintering electric furnace

click enlarge

GSX series high-efficiency energy-saving high-temperature sintering electric furnace

Detailed introduction
           GSX series high-efficiency energy-saving high-temperature sintering electric furnace
    This furnace is suitable for sintering of laboratory and industrial inorganic materials, especially for the industrial production of zirconia and alumina. The use of new materials and new design schemes has created a new milestone in energy saving for electric furnaces.
 
First, the power consumption of this furnace is 25-30% of ordinary electric furnace, which greatly saves power and reduces costs.
Second, shorten the production cycle. The electric furnace saves 50% of the cooling time and shortens the production cycle.
Third, the furnace has good uniformity and good product appearance.
Fourth, the lifting type is stable and the product is easy to load and unload.
 
Model specifications
Hearth size
Length / width / height mm
Rated sintering temperature
Work rate
kw
control method
GSX-1-13,16
300/300/300
1350, 1650
12,15
32 segment program control
GSX-2-13,16
400/400/400
1350, 1650
18,25
32 segment program control
GSX-3-13,16
600/600/600
1350, 1650
30,40
32 segment program control
GSX-4-13,16
800/800/800
1350, 1650
40, 60
32 segment program control
Customized non-standard electric furnaces of various sizes and temperatures
 
Example:
 
    At the request of a company in Zhuzhou (producing zirconia and alumina industrial supplies), our company produced 400/350/600 electric furnaces in 2005 for firing small batches of products, achieving good energy-saving effects and shortening the basis of production cycles. Designed and manufactured. Its energy saving effect set a new milestone in energy saving of electric furnaces.
This time, the effective capacity of the lifting electric furnace designed by our company is 600/600 / 600mm, 1650 ℃, compared with the ordinary electric furnace of the same specification produced by a company in Yixing:
1. Consumption of ordinary electric furnace (40 hours) consumes about 1000 kWh. Completion of sintering of new electric furnace (40 hours) consumes about 230 kWh, saving 770 kWh. Greatly save electricity and reduce costs.
Second, shorten the production cycle. It takes about 3-4 days to complete the cooling of the ordinary electric furnace, and about 1-2 days to complete the cooling of the new electric furnace. Save time by 2 days and shorten production cycle.
Third, the furnace temperature uniformity is good, the product appearance after sintering is good.
Fourth, the lifting type is stable, and the product is easy to load and unload.
 
 
 

Product consultation

Message box

  • theme:

  • Message content:

  • Your unit:

  • Your Name:

  • contact number:

  • Common mailbox:

  • Address:

  • province:

  • Verification code:

contact details

Email: 130732189@qq.com
Address: No. 168, Xiaotang Middle Road, German Industrial Park, National High-tech Zone (Yuetang District), Xiangtan City, Hunan Province
Follow us on WeChat Scan:
online service Contact information QR code

Consulting online customer service

Service Hotline

0731-58534888,13607322318

Scan and follow us